For a main contractor like MACE, the main aim of any project is to deliver it on time and within budget. Like most large projects trying to gets all the trades finished on time is a major challenge and at the TVC it was no different.

The 3 large M&E packages at TVC incorporated circa £3.5m of fire rated ducting. This value included the supply and install of fire rated Basement Smoke Extract and Basement Make up Ducting as well as non-domestic Kitchen Extract Ducting. The project director for MACE MEP commented:

"The installation went extremely well with deliveries made on time, installation of a high quality and the package completed on time".

The project install was 18 months for Fire Protection Ltd starting in May 2016 and came at a busy time with a number of other projects being installed at the same time. Through good programming and dedication by our factories the supply went smoothly. As with all large projects a number of project specific details needed to be produced with our designers producing over 20 of these before and during installation, helping to ensure the programme ran to time.

Fire Protection Ltd were proud to have been associated with such a high profile project delivering fire safe ducting to keep residents protected.